SOLAR Β· ERCOT

Eiffel Solar II

Eiffel Solar II is a 41.7 MW solar request withdrawn in the ERCOT interconnection queue, in Lamar County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2022 (completed)
  2. Withdrawn / abandonedOct 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0438
Grid region
ERCOT (Texas)
Developer
PARIS SOLAR FARM, LLC
Connection point (POI)
Double Tap 138kV:_x000D_ 1693 Paris SW - 11770 Lamar Blossom Ckt1_x000D_ 1693 Paris SW - 1768 Deport Rea Ckt1
Location
Lamar County, Texas
Technology
Solar: 41.7 MW
Total requested
41.7 MW
Study phase
FIS Complete
Queue status
Withdrawn
Entered queue
5 January 2022
Proposed online date
October 2023
Withdrawn
October 2022

Location

Marker shows the centre of Lamar County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Lamar County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem