United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Olive Solar

Olive Solar is a 39.6 MW solar request withdrawn in the ERCOT interconnection queue, in Coke County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedJul 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0273
Grid region
ERCOT (Texas)
Developer
ABEI ENERGY&INFRASTRUCTURE LLC
Connection point (POI)
Tap 69kV 6422 Edith - 6423 Cedar Hill
Location
Coke County, Texas
Technology
Solar: 39.6 MW
Total requested
39.6 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
15 April 2019
Proposed online date
July 2022
Withdrawn
July 2020

Location

Marker shows the centre of Coke County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Coke County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem