United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTOlive Solar
Olive Solar is a 39.6 MW solar request withdrawn in the ERCOT interconnection queue, in Coke County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedJul 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 21INR0273
- Grid region
- ERCOT (Texas)
- Developer
- ABEI ENERGY&INFRASTRUCTURE LLC
- Connection point (POI)
- Tap 69kV 6422 Edith - 6423 Cedar Hill
- Location
- Coke County, Texas
- Technology
- Solar: 39.6 MW
- Total requested
- 39.6 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 15 April 2019
- Proposed online date
- July 2022
- Withdrawn
- July 2020
Location
Marker shows the centre of Coke County; the queue data does not give exact sites.
Other requests in Coke County
- Ulysses SolarSolar Β· 151 MW Β· agreement signed
- Roboman SolarSolar Β· 273 MW Β· in study
- Coke BESSBattery storage Β· 220 MW Β· in study
- Rocky Point BESSBattery storage Β· 151 MW Β· in study
- Hayrick BESSBattery storage Β· 114 MW Β· in study
- Fort Chadbourne Cattle BESSBattery storage Β· 50.2 MW Β· in study
- Aviator WindOnshore wind Β· 525 MW Β· built
- BlueBell SolarSolar Β· 30.0 MW Β· built
- Meissa SolarSolar Β· 136 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem