πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

Castle Gap Solar 2

Castle Gap Solar 2 is a 30.0 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedSep 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
16INR0065a
Grid region
ERCOT (Texas)
Developer
Solar Prime
Connection point (POI)
132783 Castle Gap 138kV
Technology
Solar: 30.0 MW
Total requested
30.0 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
19 September 2014
Agreement signed
4 September 2015
Proposed online date
January 2020

Location

No county location in the queue data.

Power plants in Β· Transmission lines in