United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

Mustang Solar Project

Mustang Solar Project is a 30.0 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2011 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedNov 2013 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
13INR0031
Grid region
ERCOT (Texas)
Developer
Pioneer Green Energy, LLC
Technology
Solar: 30.0 MW
Total requested
30.0 MW
Study phase
IA
Queue status
Withdrawn
Entered queue
14 February 2011
Agreement signed
25 November 2013
Proposed online date
December 2015

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem