United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) — page 21
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Pisgah Ridge Solar 50MW Solar · Duke Energy Renewables Solar, LLC |
50.6 MW | Withdrawn / abandoned |
| Unruh Storage Battery storage · BT Unruh Solar, LLC |
50.5 MW | Withdrawn / abandoned |
| Pruett Storage Battery storage · Crandall Solar LLC |
50.5 MW | Withdrawn / abandoned |
| Peridot Storage Battery storage · BT Castro Storage, LLC |
50.5 MW | Withdrawn / abandoned |
| Canvasback II BESS Other · Black Mountain Energy Storage II |
50.4 MW | Withdrawn / abandoned |
| Mallard BESS II Other · BLACK MOUNTAIN ENERGY STORAGE II |
50.4 MW | Withdrawn / abandoned |
| Alpine Solar 1 Solar · Element Power US, LLC |
50.0 MW | Withdrawn / abandoned |
| Elizabeth Battery Battery storage · Exelon |
50.0 MW | Withdrawn / abandoned |
| Paddlewheel BESS SLF Battery storage · Paddlewheel Solar, LLC |
50.0 MW | Withdrawn / abandoned |
| Saragosa Solar Plant Solar · Austin Energy |
50.0 MW | Withdrawn / abandoned |
| Ivory Solar C Solar · OCI Solar |
50.0 MW | Withdrawn / abandoned |
| River Rock Solar Solar · RES Americas |
50.0 MW | Withdrawn / abandoned |
| SunRay Additional Solar · OCI SunRay LLC |
50.0 MW | Withdrawn / abandoned |
| GSE Three Solar Solar · Alpin Sun |
50.0 MW | Withdrawn / abandoned |
| Able Solar Solar · Sunchase Power |
50.0 MW | Withdrawn / abandoned |
| Hecate Solar A Solar · Hecate Energy |
50.0 MW | Withdrawn / abandoned |
| Oscar Storage Project Other · Woodlands Energy Renewables LLC |
50.0 MW | Withdrawn / abandoned |
| BThorn Solar · SunEdison |
50.0 MW | Withdrawn / abandoned |
| Lapetus Solar Solar · 7x Energy |
50.0 MW | Withdrawn / abandoned |
| SolaireHolman 2 Solar · Solaire Direct |
50.0 MW | Withdrawn / abandoned |
| Boca Chica Solar Solar · Tenaska Solar XVIII, LLC |
50.0 MW | Withdrawn / abandoned |
| Rio Pecos Wind Project - Ph 1 Onshore wind · Akuo Energy USA |
50.0 MW | Withdrawn / abandoned |
| Ivory Solar A Solar · OCI Solar |
50.0 MW | Withdrawn / abandoned |
| Lindale Reliability Energy Gas · Decker Energy International |
50.0 MW | Withdrawn / abandoned |
| Amber Storage Other · Belltown Power Texas |
50.0 MW | Withdrawn / abandoned |
| San Patricio Wind Onshore wind · International Power America |
50.0 MW | Withdrawn / abandoned |
| Live Oak Solar Solar · Infinity Renewables |
50.0 MW | Withdrawn / abandoned |
| Brazos BESS 2 Other · Brazos Wind Ventures, LLC |
50.0 MW | Withdrawn / abandoned |
| Cody Storage Other · Woodlands Energy Renewables LLC |
50.0 MW | Withdrawn / abandoned |
| Ivory Solar B Solar · OCI Solar |
50.0 MW | Withdrawn / abandoned |
| Old 300 Storage Other · Old 300 Solar Center, LLC |
50.0 MW | Withdrawn / abandoned |
| Morrow Lake Solar II Solar |
50.0 MW | Withdrawn / abandoned |
| Stockyard Grid Batt II Other · Stockyard Grid, LLC |
49.2 MW | Withdrawn / abandoned |
| BA Onshore wind · Infinity Wind |
48.0 MW | Withdrawn / abandoned |
| Barney Davis IPAC #4 repower Gas |
48.0 MW | Withdrawn / abandoned |
| Gulf Wind 2 Expansion Onshore wind · Texas GULF WIND 2 LLC |
47.9 MW | Withdrawn / abandoned |
| Tarbush Solar Solar · One Energy Renewables |
47.5 MW | Withdrawn / abandoned |
| Jack Barton BESS Battery storage · Jack Barton BESS |
47.3 MW | Withdrawn / abandoned |
| Cowboy Newt Solar Solar · Belltown Power |
45.0 MW | Withdrawn / abandoned |
| McCommas Power Project Other · McCommas Landfill Partners, LP |
45.0 MW | Withdrawn / abandoned |
| El Patrimonio Solar 2 Solar · Heritage Solar, LLC |
45.0 MW | Withdrawn / abandoned |
| Opal Solar Solar · Innovative Solar 165 |
45.0 MW | Withdrawn / abandoned |
| 2W Whatley Phase 1 Onshore wind · TripleT Renewable Enrgy Solutions, LLC |
45.0 MW | Withdrawn / abandoned |
| Citrine Solar Solar · Innovative Solar 145 |
45.0 MW | Withdrawn / abandoned |
| SP-TX-09 Solar · Solar Prime |
45.0 MW | Withdrawn / abandoned |
| HappyDogStorage Battery storage · Rosula Solar LLC |
44.3 MW | Withdrawn / abandoned |
| Hallmark Solar Solar · Hallmark Solar, LLC |
43.0 MW | Withdrawn / abandoned |
| Solar Prime TX-2 Solar · Solar Prime LLC |
42.0 MW | Withdrawn / abandoned |
| Maple Solar Solar · SunEdison |
42.0 MW | Withdrawn / abandoned |
| Shakes Solar Solar · Cypress Creek Renewables |
42.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)