SOLAR Β· ERCOT

Cowboy Newt Solar

Cowboy Newt Solar is a 45.0 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2018 (completed)
  2. Withdrawn / abandonedAug 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0059
Grid region
ERCOT (Texas)
Developer
Belltown Power
Connection point (POI)
tap 69kV 224 Iasca - 225 Forreston
Technology
Solar: 45.0 MW
Total requested
45.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
2 March 2018
Proposed online date
April 2020
Withdrawn
August 2018

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem