United States βΊ Grid βΊ Interconnection queues
BATTERY STORAGE Β· ERCOTUnruh Storage
Unruh Storage is a 50.5 MW battery storage request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 25INR0465
- Grid region
- ERCOT (Texas)
- Developer
- BT Unruh Solar, LLC
- Connection point (POI)
- Tap 69kV 1785 BAGWELL1_9 βΓΓ¬ 1772 LAMARBM1_9 69kV line
- Technology
- Battery: 50.5 MW
- Total requested
- 50.5 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 10 July 2023
- Proposed online date
- December 2025
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem