United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

Solar Prime TX-2

Solar Prime TX-2 is a 42.0 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2012 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
14INR0029
Grid region
ERCOT (Texas)
Developer
Solar Prime LLC
Technology
Solar: 42.0 MW
Total requested
42.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
18 June 2012
Proposed online date
December 2014

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem