United States β€Ί Grid β€Ί Interconnection queues

ONSHORE WIND Β· ERCOT

BA

BA is a 48.0 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2013 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedSep 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
14INR0057b
Grid region
ERCOT (Texas)
Developer
Infinity Wind
Connection point (POI)
tap 138kV Stephenvl (295) - Miller (331)
Technology
Wind: 48.0 MW
Total requested
48.0 MW
Study phase
IA
Queue status
Withdrawn
Entered queue
25 June 2013
Agreement signed
10 September 2015
Proposed online date
June 2016

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem