United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

Alpine Solar 1

Alpine Solar 1 is a 50.0 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2011 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
12INR0069
Grid region
ERCOT (Texas)
Developer
Element Power US, LLC
Technology
Solar: 50.0 MW
Total requested
50.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
24 February 2011
Proposed online date
December 2050

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem