SOLAR Β· ERCOT

SolaireHolman 2

SolaireHolman 2 is a 50.0 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
16INR0050
Grid region
ERCOT (Texas)
Developer
Solaire Direct
Connection point (POI)
tap 6653-6655 69kV
Technology
Solar: 50.0 MW
Total requested
50.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
13 June 2014
Proposed online date
June 2016

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem