ONSHORE WIND · ERCOT

Gulf Wind 2 Expansion

Gulf Wind 2 Expansion is a 47.9 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Kenedy County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2019 (completed)
  2. Withdrawn / abandonedNov 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0260
Grid region
ERCOT (Texas)
Developer
Texas GULF WIND 2 LLC
Connection point (POI)
80071 Zorillo 345kV
Location
Kenedy County, Texas
Technology
Wind: 47.9 MW
Total requested
47.9 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
13 March 2019
Proposed online date
June 2020
Withdrawn
November 2019

Location

Marker shows the centre of Kenedy County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Kenedy County