Boca Chica Solar

Boca Chica Solar is a 50.0 MW solar request withdrawn in the ERCOT interconnection queue, in Cameron County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2020 (completed)
  2. Withdrawn / abandonedNov 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0016
Grid region
ERCOT (Texas)
Developer
Tenaska Solar XVIII, LLC
Connection point (POI)
5965 Palo Alto 138kV
Location
Cameron County, Texas
Technology
Solar: 50.0 MW
Total requested
50.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
22 January 2020
Proposed online date
June 2023
Withdrawn
November 2020

Location

Marker shows the centre of Cameron County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Cameron County