El Patrimonio Solar 2

El Patrimonio Solar 2 is a 45.0 MW solar request withdrawn in the ERCOT interconnection queue, in Bexar County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2022 (completed)
  2. Withdrawn / abandonedApr 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0195
Grid region
ERCOT (Texas)
Developer
Heritage Solar, LLC
Connection point (POI)
tap 138kV 5429 Trumbo - 5260 Leon Creek
Location
Bexar County, Texas
Technology
Solar: 45.0 MW
Total requested
45.0 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Entered queue
12 January 2022
Proposed online date
May 2024
Withdrawn
April 2022

Location

Marker shows the centre of Bexar County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Bexar County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem