United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Pisgah Ridge Solar 50MW

Pisgah Ridge Solar 50MW is a 50.6 MW solar request withdrawn in the ERCOT interconnection queue, in Navarro County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2020 (completed)
  2. Withdrawn / abandonedAug 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0389
Grid region
ERCOT (Texas)
Developer
Duke Energy Renewables Solar, LLC
Connection point (POI)
tap 345kV 68091 Navarro - 46020 Limestone
Location
Navarro County, Texas
Technology
Solar: 50.6 MW
Total requested
50.6 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
23 July 2020
Proposed online date
December 2022
Withdrawn
August 2020

Location

Marker shows the centre of Navarro County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Navarro County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem