OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in Maine — page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Wind Onshore wind |
104 MW | Withdrawn / abandoned |
| Wind Onshore wind |
104 MW | Withdrawn / abandoned |
| Wind Onshore wind |
104 MW | Withdrawn / abandoned |
| Wind Onshore wind |
104 MW | Withdrawn / abandoned |
| Wind Onshore wind |
104 MW | Withdrawn / abandoned |
| Wind Onshore wind |
104 MW | Withdrawn / abandoned |
| Wind Onshore wind |
104 MW | Withdrawn / abandoned |
| Wind Onshore wind |
104 MW | Withdrawn / abandoned |
| Wind Onshore wind |
104 MW | Withdrawn / abandoned |
| Solar Solar |
103 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
102 MW | Withdrawn / abandoned |
| Solar Solar |
100 MW | Withdrawn / abandoned |
| Solar Solar |
100 MW | Withdrawn / abandoned |
| Solar Solar |
100 MW | Withdrawn / abandoned |
| Wind Onshore wind |
93.6 MW | Withdrawn / abandoned |
| Wind Onshore wind |
92.3 MW | Withdrawn / abandoned |
| Wind Project Onshore wind |
90.0 MW | Withdrawn / abandoned |
| Solar Solar |
90.0 MW | Withdrawn / abandoned |
| Downeast Wind Onshore wind |
90.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
89.7 MW | Withdrawn / abandoned |
| Wind Onshore wind |
85.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
84.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
79.9 MW | Withdrawn / abandoned |
| Wind Farm Onshore wind |
79.2 MW | Withdrawn / abandoned |
| Solar Solar |
78.4 MW | Withdrawn / abandoned |
| Solar Solar |
75.3 MW | Withdrawn / abandoned |
| Solar Solar |
75.0 MW | Withdrawn / abandoned |
| Solar Solar |
75.0 MW | Withdrawn / abandoned |
| Steam Turbines Other |
75.0 MW | Withdrawn / abandoned |
| Solar Solar |
72.0 MW | Withdrawn / abandoned |
| Solar Solar |
68.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
65.6 MW | Withdrawn / abandoned |
| Solar Solar |
65.0 MW | Withdrawn / abandoned |
| Detroit/Guilford/Belfast DG Area Study Solar + storage |
57.7 MW | Withdrawn / abandoned |
| Roxbury Solar Solar |
55.0 MW | Withdrawn / abandoned |
| Solar Increase (QP1145) Solar |
54.1 MW | Withdrawn / abandoned |
| Wind Onshore wind |
52.8 MW | Withdrawn / abandoned |
| Lewiston CMP Cluster 5 Solar + storage |
52.5 MW | Withdrawn / abandoned |
| Battery Storage Wind + storage |
52.3 MW | Withdrawn / abandoned |
| Solar Solar |
51.5 MW | Withdrawn / abandoned |
| Solar Solar |
51.4 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
50.7 MW | Withdrawn / abandoned |
| Solar Solar |
50.0 MW | Withdrawn / abandoned |
| Longfellow Wind Onshore wind |
50.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
48.0 MW | Withdrawn / abandoned |
| Swain Solar Solar |
40.4 MW | Withdrawn / abandoned |
| Solar Solar |
40.0 MW | Withdrawn / abandoned |
| Biomass Other |
40.0 MW | Withdrawn / abandoned |
| Wind farm Onshore wind |
39.6 MW | Withdrawn / abandoned |
| Gas Turbine Gas |
35.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)