United States β€Ί Grid β€Ί Interconnection queues β€Ί Maine

ONSHORE WIND Β· ISO-NE

Wind Project

Wind Project is a 90.0 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Franklin County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2005 (completed)
  2. Withdrawn / abandonedSep 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
131
Grid region
ISO-NE (New England)
Connection point (POI)
Bigelow Substation
Location
Franklin County, Maine
Technology
Wind: 90.0 MW
Total requested
90.0 MW
Service type
Other
Queue status
Withdrawn
Entered queue
21 June 2005
Proposed online date
December 2010
Withdrawn
September 2008

Location

Marker shows the centre of Franklin County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Franklin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem