Solar is a 100 MW solar request withdrawn in the ISO-NE interconnection queue, in Penobscot County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2020 (completed)
  2. Withdrawn / abandonedOct 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1065
Grid region
ISO-NE (New England)
Connection point (POI)
BHE 115kV Line 97
Location
Penobscot County, Maine
Technology
Solar: 100 MW
Total requested
100 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
25 September 2020
Proposed online date
November 2024
Withdrawn
October 2020

Location

Marker shows the centre of Penobscot County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Penobscot County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem