πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Maine

ONSHORE WIND Β· ISO-NE

Wind

Wind is a 84.0 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Somerset County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2012 (completed)
  2. Withdrawn / abandonedOct 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
393
Grid region
ISO-NE (New England)
Connection point (POI)
CMP 115 kV W. S. Wyman Hydro Substation
Location
Somerset County, Maine
Technology
Wind: 84.0 MW
Total requested
84.0 MW
Service type
Energy only (ERIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
7 May 2012
Proposed online date
November 2016
Withdrawn
October 2015

Location

Marker shows the centre of Somerset County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Somerset County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem