United States βΊ Grid βΊ Interconnection queues βΊ Maine
SOLAR Β· ISO-NESolar
Solar is a 100 MW solar request withdrawn in the ISO-NE interconnection queue, in Penobscot County, Maine.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2020 (completed)
- Withdrawn / abandonedJan 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1085
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- BHE 115kV Line 64
- Location
- Penobscot County, Maine
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 17 November 2020
- Proposed online date
- December 2024
- Withdrawn
- January 2021
Location
Marker shows the centre of Penobscot County; the queue data does not give exact sites.
Other requests in Penobscot County
- Millinocket Frequency ConversionHydro Β· 126 MW Β· built
- Great Northern - MillinocketHydro Β· 126 MW Β· built
- Millinocket Battery additonOther Β· 126 MW Β· built
- Passadumkeag WindparkOnshore wind Β· 40.0 MW Β· built
- Rollins Wind (Stetson Wind Phase II)Onshore wind Β· 27.8 MW Β· built
- Dundee WindOnshore wind Β· 27.0 MW Β· built
- Silver Maple WindOnshore wind Β· 20.0 MW Β· built
- Red Shield Acquisition - BiomassOther Β· 16.0 MW Β· built
- Georgia PacificOther Β· 16.0 MW Β· built
- Red Shield( Georgia Pacific/Old Town)Other Β· 16.0 MW Β· built
- Red Shield Acquisition #5Gas Β· 9.5 MW Β· built
- Pisgah MountainOnshore wind Β· 9.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem