🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Home › Grid infrastructure › Connection queue

NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue on the SP Transmission (south Scotland) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown31969.7 GW in total
In planning319scoping or awaiting consent
Consented or building64closest to connecting
Built84connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

319 projects · page 6 of 7
ProjectCapacityStageConnection siteFrom
The Drum Wind Farm
Onshore wind · Wind Estate (UK) Limited
58 MWScoping Glenmuckloch 132kV Substation
SP Transmission (south Scotland)
Oct 2037
GH DEVCO Gretna Green BESS
Battery storage · Gretna Energy Storage Limited
56 MWScoping Gresham House Gretna 400/132kv Substation
SP Transmission (south Scotland)
Oct 2032
Harestanes West Wind Farm
Onshore wind · Scottish Power Renewables (UK) Limited
56 MWScoping Harestanes West Wind Farm 132/33kV
SP Transmission (south Scotland)
Sep 2029
Manquhill Wind Farm
Wind + storage · Energyfarm UK Manquhill Ltd
56 MWScoping Manquhill Wind Farm 132/33kV Substation
SP Transmission (south Scotland)
Oct 2036
AGS Nerston 2 BESS
Battery storage · Advance Grid Solutions Limited
55 MWScoping East Kilbride B 275/33kV Substation
SP Transmission (south Scotland)
Oct 2033
AGS Nerston 3 BESS
Battery storage · Advance Grid Solutions Limited
55 MWScoping East Kilbride B 275/33kV Substation
SP Transmission (south Scotland)
Oct 2033
Drinkstone Hybrid
Solar + storage · Buccleuch Estates, Ltd. (The)
55 MWScoping Drinkstone Hybrid 132/33kV substation
SP Transmission (south Scotland)
Jul 2035
Rogerton Cottage BESS
Battery storage · Drax BESS Ek Limited
55 MWScoping East Kilbride 275/33kV GSP
SP Transmission (south Scotland)
Mar 2027
Lees Hill Renewable Energy Park
Solar + storage · Fred Olsen Renewables Limited
54 MWScoping Kelloe Mains 400kV Substation
SP Transmission (south Scotland)
Apr 2033
Sclenteuch Energy Park
Wind + storage · Sclenteuch Energy Limited
54 MWScoping Sclenteuch Energy Park 132kV
SP Transmission (south Scotland)
Oct 2029
Ditcher Law
Wind + storage · E Power Limited
53 MWAwaiting Consents Dunlaw Extension 132/33kV
SP Transmission (south Scotland)
Oct 2031
Kaimes Energy Park
Battery storage · HP Trotter t/a Printonan Farm
51 MWScoping Kaimes GSP
SP Transmission (south Scotland)
Apr 2027
AGS Nerston BESS
Battery storage · Advance Grid Solutions Limited
50 MWScoping East Kilbride B 275/33kV Substation
SP Transmission (south Scotland)
Oct 2033
Blackbraes PV+BESS
Solar + storage · Chint Solar UK Management Ltd
50 MWScoping Blackbraes IDNO GSP
SP Transmission (south Scotland)
Oct 2031
Cloud Hill Windfarm
Wind + storage · Cloud Hill Windfarm Limited
50 MWAwaiting Consents Glenglass 132/33kV
SP Transmission (south Scotland)
May 2030
Coldstream BESS
Battery storage · Igp Energy Storage 4 Limited
50 MWScoping Eccles 400/132kV
SP Transmission (south Scotland)
Oct 2030
Cornharrow Wind Farm
Onshore wind · Energyfarm UK Cornharrow LLP
50 MWScoping Quantans Hill 132kV Substation
SP Transmission (south Scotland)
Oct 2030
Elvanfoot (50MW) Energy Storage
Battery storage · Elvanfoot Energy Storage 2 Limited
50 MWScoping Elvanfoot Energy Storage 132/33Kv Collector Substation
SP Transmission (south Scotland)
Oct 2029
ER BBR Energy
Solar + storage · Er Project Development Co Limited
50 MWScoping Er Bbr Energy 132kV Substation
SP Transmission (south Scotland)
Oct 2029
Fell Wind Farm
Onshore wind · Energyfarm UK Fell LLP
50 MWScoping SPT Margree collector substation
SP Transmission (south Scotland)
Oct 2029
Margree Wind Farm
Onshore wind · Energyfarm UK Margree LLP
50 MWAwaiting Consents SPT Margree collector substation
SP Transmission (south Scotland)
Oct 2029
Mosspark Energy Park
Solar + storage · REG Power Developments Limited
50 MWScoping Dumfries 132/33kV
SP Transmission (south Scotland)
May 2029
Scottish Water Laigh Park STW
Battery storage · Bluestone Energy Ltd
50 MWScoping Braehead Park 132/33kV
SP Transmission (south Scotland)
Jun 2028
AMP Eccles BESS
Battery storage · Eccles Grid Stability Limited
50 MWScoping Eccles 400/132kV
SP Transmission (south Scotland)
Oct 2029
Crookedstone PV
Solar · Enviromena Project Management UK Limited
50 MWScoping Strathaven GSP 33kV
SP Transmission (south Scotland)
Oct 2032
Fife 2 BESS
Battery storage · Carlton Power Limited
50 MWScoping Westfield 132/33kV
SP Transmission (south Scotland)
Jun 2028
Helen Street BESS
Battery storage · Vital Energi Solutions Limited
50 MWScoping Govan 132/33kV
SP Transmission (south Scotland)
Jun 2028
Land at Leitholm
Solar + storage · Noventum Power Solar 6 Limited
50 MWScoping Land At Leitholm 132Kv Substation
SP Transmission (south Scotland)
Jul 2031
Langbank Solar and BESS
Solar + storage · UK Renfrewshire 1 Ltd
50 MWScoping Langbank 132kV Substation
SP Transmission (south Scotland)
Oct 2027
Provan Gas Works BESS
Battery storage · Vital Energi Solutions Limited
50 MWScoping Carntyne (SPD) GSP
SP Transmission (south Scotland)
Jun 2026
STOR Field 9 BESS
Battery storage · Eku Energy Faune Projects (UK) Limited
50 MWScoping Inverkeithing GSP
SP Transmission (south Scotland)
Jul 2029
Wright Street BESS
Battery storage · P3P Partners LLP
50 MWScoping Braehead Park 132/33kV
SP Transmission (south Scotland)
Oct 2025
Devonside BESS
Battery storage · Carlton Power Limited
50 MWScoping Devonside 132/33kV
SP Transmission (south Scotland)
Aug 2028
Ochill BESS
Battery storage · Carlton Power Limited
50 MWScoping Ochill 132kV Substation
SP Transmission (south Scotland)
Aug 2028
Shielburn Energy Park
Battery storage · Sunlaws Development Company Limited
50 MWScoping Fallago 400/33kV
SP Transmission (south Scotland)
Apr 2033
Arresgill Energy Storage 1
Battery storage · Arresgill Energy Storage 1 Limited
49 MWScoping Arresgill 132kV Substation
SP Transmission (south Scotland)
Oct 2031
Dougliehill BESS
Battery storage · Bluestone Energy Ltd
49 MWScoping Devol Moor 132/33Kv Grid Supply Point Substation
SP Transmission (south Scotland)
Oct 2026
Hare Craig Wind Farm
Onshore wind · Hare Craig Windfarm LLP
46 MWAwaiting Consents Hare Craig 33kV Substation
SP Transmission (south Scotland)
Oct 2028
Callisterhall Wind Farm
Onshore wind · E Power Limited
46 MWScoping Callisterhall 132kV
SP Transmission (south Scotland)
Apr 2029
Cleveden Road BESS
Battery storage · Vital Energi Solutions Limited
43 MWScoping Killermont GSP
SP Transmission (south Scotland)
Jun 2031
Gladsmuir Wind Farm
Onshore wind · Wind Estate (UK) Limited
43 MWScoping Harburn 132/33kV Grid Supply Point Substation
SP Transmission (south Scotland)
Oct 2032
Dalmarnock Storage BESS
Battery storage · Viridisia Ltd
42 MWScoping Dalmarnock Storage BESS 132kV Substation
SP Transmission (south Scotland)
Apr 2030
GH DEVCO Kincardine BESS
Battery storage · Kincardine Storage Limited
42 MWScoping GH DEVCO KINCARDINE BESS 132kV SUBSTATION
SP Transmission (south Scotland)
Oct 2029
Glentaggart 42MW BESS
Battery storage · Glentaggart Wind Limited
42 MWScoping Glentaggart WF 33kV Substation
SP Transmission (south Scotland)
Oct 2027
Lamford Hill
Solar + storage · Benbrack Wind Farm Limited
42 MWScoping Benbrack Wind Farm 132/33kV Substation
SP Transmission (south Scotland)
Oct 2036
Coldstream Solar PV Plant
Solar · Conrad Energy (Developments) II Limited
41 MWScoping Eccles GSP
SP Transmission (south Scotland)
Jul 2031
Gilbertfield Farm BESS
Battery storage · GPC 678 LTD
40 MWScoping Clydesmill GSP
SP Transmission (south Scotland)
Apr 2029
Glasgow Road 40MW BESS
Battery storage · GPC 1137 Ltd
40 MWScoping Giffnock 275/33kV
SP Transmission (south Scotland)
Oct 2028
Hareshaw Rig Wind Farm
Onshore wind · Hareshaw Rig Wf Limited
40 MWScoping Hopsrig Collector 132/33kV Substation
SP Transmission (south Scotland)
Oct 2029
Kennishead
Battery storage · Starlight Energy UK Limited
40 MWScoping Haggs Road GSP
SP Transmission (south Scotland)
Oct 2031

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.