Grid infrastructure βΊ Connection queue βΊ Solar + storage
SOLAR + STORAGE Β· SPTER BBR Energy
ER BBR Energy is a 50 MW solar + storage project in planning, connecting to the SP Transmission (south Scotland) network at Er Bbr Energy 132kV Substation, with capacity due from October 2029. The connection agreement is held by Er Project Development Co Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2029 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-003508
- Customer
- Er Project Development Co Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 50 MW
- Change in this agreement
- +50 MW
- Capacity effective from
- 30 October 2029
- Connection site
- Er Bbr Energy 132kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem