Grid infrastructure › Connection queue › Solar + storage
SOLAR + STORAGE · SPTLand at Leitholm
Land at Leitholm is a 50 MW solar + storage project in planning, connecting to the SP Transmission (south Scotland) network at Land At Leitholm 132Kv Substation, with capacity due from July 2031. The connection agreement is held by Noventum Power Solar 6 Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Jul 2031 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-004265
- Customer
- Noventum Power Solar 6 Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 50 MW
- Change in this agreement
- +50 MW
- Capacity effective from
- 31 July 2031
- Connection site
- Land At Leitholm 132Kv Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem