Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · SPTRogerton Cottage BESS
Rogerton Cottage BESS is a 55 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at East Kilbride 275/33kV GSP, with capacity due from March 2027. The connection agreement is held by Drax BESS Ek Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Mar 2027 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-003543
- Customer
- Drax BESS Ek Limited
- Technology
- Energy Storage System
- Total capacity
- 55 MW
- Change in this agreement
- +55 MW
- Capacity effective from
- 26 March 2027
- Connection site
- East Kilbride 275/33kV GSP
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Scoping
- Connections reform gate
- Gate 2
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem