BATTERY STORAGE Β· SPTSTOR Field 9 BESS
STOR Field 9 BESS is a 50 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Inverkeithing GSP, with capacity due from July 2029. The connection agreement is held by Eku Energy Faune Projects (UK) Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Jul 2029 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002528
- Customer
- Eku Energy Faune Projects (UK) Limited
- Technology
- Energy Storage System
- Total capacity
- 50 MW
- Change in this agreement
- +50 MW
- Capacity effective from
- 30 July 2029
- Connection site
- Inverkeithing GSP
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Scoping
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem