Grid infrastructure βΊ Connection queue βΊ Solar + storage
SOLAR + STORAGE Β· SPTBlackbraes PV+BESS
Blackbraes PV+BESS is a 50 MW solar + storage project in planning, connecting to the SP Transmission (south Scotland) network at Blackbraes IDNO GSP, with capacity due from October 2031. The connection agreement is held by Chint Solar UK Management Ltd.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2031 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-005005
- Customer
- Chint Solar UK Management Ltd
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 50 MW
- Change in this agreement
- +50 MW
- Capacity effective from
- 31 October 2031
- Connection site
- Blackbraes IDNO GSP
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Scoping
Connection site
The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem