Grid infrastructure β€Ί Connection queue β€Ί Onshore wind

ONSHORE WIND Β· SPT

Callisterhall Wind Farm

Callisterhall Wind Farm is a 46 MW onshore wind project in planning, connecting to the SP Transmission (south Scotland) network at Callisterhall 132kV, with capacity due from April 2029. The connection agreement is held by E Power Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Apr 2029 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001965
Customer
E Power Limited
Technology
Wind Onshore
Total capacity
46 MW
Change in this agreement
+46 MW
Capacity effective from
27 April 2029
Connection site
Callisterhall 132kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The connection site could not be placed on the map.

Projects connecting near Callisterhall Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem