BATTERY STORAGE Β· SPT

Gilbertfield Farm BESS

Gilbertfield Farm BESS is a 40 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Clydesmill GSP, with capacity due from April 2029. The connection agreement is held by GPC 678 LTD.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Apr 2029 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-003564
Customer
GPC 678 LTD
Technology
Energy Storage System
Total capacity
40 MW
Change in this agreement
+40 MW
Capacity effective from
30 April 2029
Connection site
Clydesmill GSP
Transmission owner
SP Transmission (south Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Scoping

Connection site

The connection site could not be placed on the map.

Projects connecting near Clydesmill GSP Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem