Grid infrastructure › Connection queue › Wind + storage
WIND + STORAGE · SPTSclenteuch Energy Park
Sclenteuch Energy Park is a 54 MW wind + storage project in planning, connecting to the SP Transmission (south Scotland) network at Sclenteuch Energy Park 132kV, with capacity due from October 2029. The connection agreement is held by Sclenteuch Energy Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2029 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002195
- Customer
- Sclenteuch Energy Limited
- Technology
- Energy Storage System, Wind Onshore
- Total capacity
- 54 MW
- Change in this agreement
- +54 MW
- Capacity effective from
- 31 October 2029
- Connection site
- Sclenteuch Energy Park 132kV
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem