Grid infrastructure › Connection queue › Solar + storage
SOLAR + STORAGE · SPTLamford Hill
Lamford Hill is a 42 MW solar + storage project in planning, connecting to the SP Transmission (south Scotland) network at Benbrack Wind Farm 132/33kV Substation, with capacity due from October 2036. The connection agreement is held by Benbrack Wind Farm Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2036 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001481-2
- Customer
- Benbrack Wind Farm Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar), Wind Onshore
- Total capacity
- 42 MW
- Change in this agreement
- +22 MW
- Capacity effective from
- 31 October 2036
- Connection site
- Benbrack Wind Farm 132/33kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Other projects at Benbrack Wind Farm 132/33kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem