SOLAR + STORAGE · SPTLees Hill Renewable Energy Park
Lees Hill Renewable Energy Park is a 54 MW solar + storage project in planning, connecting to the SP Transmission (south Scotland) network at Kelloe Mains 400kV Substation, with capacity due from April 2033. The connection agreement is held by Fred Olsen Renewables Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Apr 2033 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-005949
- Customer
- Fred Olsen Renewables Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar), Wind Onshore
- Total capacity
- 54 MW
- Change in this agreement
- +54 MW
- Capacity effective from
- 15 April 2033
- Connection site
- Kelloe Mains 400kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The connection site could not be placed on the map.
Other projects at Kelloe Mains 400kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem