Grid infrastructure β€Ί Connection queue β€Ί Solar

SOLAR Β· SPT

Crookedstone PV

Crookedstone PV is a 50 MW solar project in planning, connecting to the SP Transmission (south Scotland) network at Strathaven GSP 33kV, with capacity due from October 2032. The connection agreement is held by Enviromena Project Management UK Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2032 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-006119
Customer
Enviromena Project Management UK Limited
Technology
PV Array (Photo Voltaic/solar)
Total capacity
50 MW
Change in this agreement
+50 MW
Capacity effective from
31 October 2032
Connection site
Strathaven GSP 33kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Strathaven GSP Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem