BATTERY STORAGE · SPTArresgill Energy Storage 1
Arresgill Energy Storage 1 is a 49 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Arresgill 132kV Substation, with capacity due from October 2031. The connection agreement is held by Arresgill Energy Storage 1 Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2031 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-003246
- Customer
- Arresgill Energy Storage 1 Limited
- Technology
- Energy Storage System
- Total capacity
- 49 MW
- Change in this agreement
- +49 MW
- Capacity effective from
- 31 October 2031
- Connection site
- Arresgill 132kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Other projects at Arresgill 132kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem