NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue on the SSEN Transmission (north Scotland) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown30385.5 GW in total
In planning303scoping or awaiting consent
Consented or building52closest to connecting
Built89connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

303 projects · page 6 of 7
ProjectCapacityStageConnection siteFrom
Drumore Farm
Battery storage · Drumore Battery Storage Limited
50 MWScoping Alness 2 275/33 kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2030
Dunmill Energy Storage
Battery storage · Dunmill Energy Storage Limited
50 MWScoping Bridge of Dun GSP
SSEN Transmission (north Scotland)
Jun 2032
Fauldielaw
Solar · Cairn Duhie Energy Limited
50 MWScoping Arbroath 2 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2032
Greenburn Wind & BESS
Wind + storage · Hm Gb (Wind) Ltd
50 MWScoping Coupar Angus 2 GSP
SSEN Transmission (north Scotland)
Oct 2031
Millennium East
Onshore wind · Renantis UK Limited
50 MWScoping FORT AUGUSTUS 2 400/33kV GRID SUPPLY POINT SUBSTATION
SSEN Transmission (north Scotland)
Oct 2035
Navas BESS
Battery storage · Opde UK Limited
50 MWScoping Lairg GSP
SSEN Transmission (north Scotland)
Oct 2033
Pitkerro Road
Battery storage · Vital Energi Solutions Limited
50 MWScoping Milton of Craigie GSP
SSEN Transmission (north Scotland)
Oct 2033
Scatsta Greener Grid Park
Battery storage · Statkraft Hydrogen UK Holding Limited
50 MWScoping Scatsta 132kV Substation
SSEN Transmission (north Scotland)
Oct 2028
Spittal
Battery storage · Spittal Battery Storage Limited
50 MWScoping Mybster 2 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2030
Taigh an Uillt Energy Storage Park
Battery storage · Springbank Energy Storage Park Limited
50 MWScoping Ichrachan 132/33Kv Grid Supply Point Substation
SSEN Transmission (north Scotland)
Oct 2035
Templeton BESS
Battery storage · Templeton Battery Storage Limited
50 MWScoping Lyndhurst 132/33kV
SSEN Transmission (north Scotland)
Oct 2031
Druim Leathann BEGA
Onshore wind · Druim Leathann Windfarm Limited
50 MWScoping Stornoway GSP
SSEN Transmission (north Scotland)
Mar 2027
Lyndhurst Camperdown BESS
Battery storage · Geocore Ltd
50 MWScoping Charleston GSP 132/33kV
SSEN Transmission (north Scotland)
Oct 2031
Sallachy Wind Farm
Onshore wind · Sallachy Wind Limited
50 MWAwaiting Consents Cassley GSP
SSEN Transmission (north Scotland)
Jul 2028
Baillie Greener Grid Park
Battery storage · Statkraft UK Ltd
48 MWScoping Baillie 275KV Substation
SSEN Transmission (north Scotland)
Sep 2030
Lisa's Battery Storage
Battery storage · Potencia Energy Limited
47 MWAwaiting Consents Mybster 3 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2030
Contullich BESS
Battery storage · Contullich Energy Storage Limited
45 MWScoping Alness 2 275/33 kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2030
Daviot Windfarm BEGA
Wind + storage · Cubico UK Development Limited
45 MWScoping Inverness 132/33Kv Grid Supply Point Substation
SSEN Transmission (north Scotland)
Oct 2030
Giants Burn Wind Farm
Onshore wind · Gb Wind Farm Limited
44 MWScoping New Dunoon 132/33kV GSP Substation
SSEN Transmission (north Scotland)
May 2030
Cairnborrow Wind Energy Hub
Wind + storage · Bpuwl 29 Limited
43 MWScoping Cairnford GSP
SSEN Transmission (north Scotland)
Oct 2031
Melvich Wind Energy Hub (BEGA)
Wind + storage · Melvich Wind Energy Hub Limited
43 MWAwaiting Consents Dounreay 2 275/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2033
Novar 2 Wind Farm
Onshore wind · Headwind Development Services Limited
43 MWScoping Alness GSP
SSEN Transmission (north Scotland)
Oct 2032
Boreland BESS
Battery storage · Boreland Energy Ltd
43 MWScoping Killin GSP
SSEN Transmission (north Scotland)
Oct 2031
Craigneil Wind Farm
Onshore wind · Esb Asset Development UK Limited
42 MWScoping Fetteresso 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2030
Meall Buidhe Wind Farm
Onshore wind · Muirden Energy LLP
40 MWScoping Shin 1 GSP
SSEN Transmission (north Scotland)
Oct 2032
Causeymire 2 Wind Farm
Onshore wind · Headwind Development Services Limited
40 MWScoping Mybster 4 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2034
Glenmore
Onshore wind · Aeuk Wind Project II Ltd
40 MWScoping Edinbane 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2034
Tarbuckle Hill Wind Farm
Onshore wind · Energiekontor UK Ltd
40 MWScoping Cairnford GSP
SSEN Transmission (north Scotland)
Oct 2031
Creag Dhubh
Onshore wind · Muirden Energy LLP
38 MWScoping Clachan 2 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2030
Dorenell Battery
Onshore wind · Clashindarroch Windfarm Extension Limited
38 MWScoping Dorenell BESS 132KV substation
SSEN Transmission (north Scotland)
Oct 2023
Cairnmore Hill Wind Farm
Onshore wind · Cairnmore Hill Energy Limited
36 MWAwaiting Consents Thurso South GSP
SSEN Transmission (north Scotland)
May 2028
Cogle Moss Wind Farm
Onshore wind · Cogle Moss Renewables LLP
36 MWScoping Mybster 2 132/33kV Substation
SSEN Transmission (north Scotland)
Aug 2025
Glasvaar
Onshore wind · E Power Limited
36 MWScoping Craig Murrail GSP
SSEN Transmission (north Scotland)
Oct 2037
Loch Luichart Extension II
Onshore wind · Bluebell Wind Farm Limited
36 MWScoping Loch Luichart Extension II Substation
SSEN Transmission (north Scotland)
Oct 2024
Finlarig
Hydro and pumped storage · Sse Generation Limited
35 MWScoping Killin 132/11kV Substation
SSEN Transmission (north Scotland)
Nov 2031
Strath Tirry
Onshore wind · Strath Tirry Wind Energy 2021 Ltd
35 MWAwaiting Consents Lairg GSP
SSEN Transmission (north Scotland)
Dec 2029
Elgin BESS
Battery storage · GPC 612 Ltd
30 MWScoping Elgin GSP
SSEN Transmission (north Scotland)
Oct 2028
Fiddes Battery Storage
Battery storage · Fiddes Battery Limited
30 MWScoping Fiddes GSP
SSEN Transmission (north Scotland)
Oct 2028
Templeton BESS
Battery storage · Templeton Battery Storage Limited
30 MWScoping Lyndhurst 132/33kV
SSEN Transmission (north Scotland)
Oct 2027
Battery Point BESS
Battery storage · Point and Sandwick Power Limited
25 MWScoping Stornoway GSP
SSEN Transmission (north Scotland)
Oct 2030
Gleann Eoghainn
Onshore wind · Renantis UK Limited
25 MWScoping Dunvegan 132/33kV Grid Supply Point Substation
SSEN Transmission (north Scotland)
Nov 2029
Strichen North BESS
Battery storage · Muirden Energy LLP
25 MWScoping Strichen GSP
SSEN Transmission (north Scotland)
Oct 2033
Hesta Head
Onshore wind · Hesta Head Wind Farm Limited
20 MWScoping Finstown (Orkney) GSP
SSEN Transmission (north Scotland)
Apr 2029
High Brenfield 2
Onshore wind · High Brenfield Wind Farm Limited
20 MWScoping Craig Murrail GSP
SSEN Transmission (north Scotland)
Oct 2034
Sage
Solar · Sage North Sea Limited
20 MWScoping St Fergus Mobil 132/11kV Substation
SSEN Transmission (north Scotland)
Apr 2029
Shire End Solar Farm
Solar · Qair Scotland Limited
20 MWScoping Abernethy 2 GSP
SSEN Transmission (north Scotland)
Oct 2033
Stoneygroves PV
Solar · Enviromena Project Management UK Limited
20 MWScoping Charleston GSP 132/33kV
SSEN Transmission (north Scotland)
Oct 2031
Talladh a Bheithe
Battery storage · Muirden Energy LLP
20 MWScoping Rannoch GSP
SSEN Transmission (north Scotland)
Oct 2035
Kincorth BESS
Battery storage · Kincorth Energy Storage System Ltd
20 MWScoping Redmoss GSP
SSEN Transmission (north Scotland)
Oct 2031
Barns of Wedderburn (ABEI ENERGY GREEN VI)
Solar + storage · Abei Energy Limited
18 MWScoping Milton of Craigie GSP
SSEN Transmission (north Scotland)
Oct 2033

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.