Grid infrastructure βΊ Connection queue βΊ Onshore wind
ONSHORE WIND Β· SHETDorenell Battery
Dorenell Battery is a 38 MW onshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at Dorenell BESS 132KV substation, with capacity due from October 2023. The connection agreement is held by Clashindarroch Windfarm Extension Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2023 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-000427
- Customer
- Clashindarroch Windfarm Extension Limited
- Technology
- Wind Onshore
- Total capacity
- 38 MW
- Change in this agreement
- +38 MW
- Capacity effective from
- 31 October 2023
- Connection site
- Dorenell BESS 132KV substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem