Grid infrastructure βΊ Connection queue βΊ Onshore wind
ONSHORE WIND Β· SHETNovar 2 Wind Farm
Novar 2 Wind Farm is a 43 MW onshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at Alness GSP, with capacity due from October 2032. The connection agreement is held by Headwind Development Services Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2032 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-004775
- Customer
- Headwind Development Services Limited
- Technology
- Wind Onshore
- Total capacity
- 43 MW
- Change in this agreement
- +43 MW
- Capacity effective from
- 31 October 2032
- Connection site
- Alness GSP
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Alness GSP
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem