Grid infrastructure βΊ Connection queue βΊ Battery storage
BATTERY STORAGE Β· SHETDunmill Energy Storage
Dunmill Energy Storage is a 50 MW battery storage project in planning, connecting to the SSEN Transmission (north Scotland) network at Bridge of Dun GSP, with capacity due from June 2032. The connection agreement is held by Dunmill Energy Storage Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Jun 2032 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-003470
- Customer
- Dunmill Energy Storage Limited
- Technology
- Energy Storage System
- Total capacity
- 50 MW
- Change in this agreement
- +50 MW
- Capacity effective from
- 30 June 2032
- Connection site
- Bridge of Dun GSP
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Scoping
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Bridge of Dun GSP
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem