Grid infrastructure β€Ί Connection queue β€Ί Onshore wind

ONSHORE WIND Β· SHET

Cairnmore Hill Wind Farm

Cairnmore Hill Wind Farm is a 36 MW onshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at Thurso South GSP, with capacity due from May 2028. The connection agreement is held by Cairnmore Hill Energy Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom May 2028 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001304
Customer
Cairnmore Hill Energy Limited
Technology
Wind Onshore
Total capacity
36 MW
Change in this agreement
+36 MW
Capacity effective from
31 May 2028
Connection site
Thurso South GSP
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Awaiting Consents

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Thurso South GSP Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem