Grid infrastructure βΊ Connection queue βΊ Onshore wind
ONSHORE WIND Β· SHETSallachy Wind Farm
Sallachy Wind Farm is a 50 MW onshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at Cassley GSP, with capacity due from July 2028. The connection agreement is held by Sallachy Wind Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Jul 2028 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002137
- Customer
- Sallachy Wind Limited
- Technology
- Wind Onshore
- Total capacity
- 50 MW
- Change in this agreement
- +50 MW
- Capacity effective from
- 31 July 2028
- Connection site
- Cassley GSP
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Awaiting Consents
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem