Grid infrastructure βΊ Connection queue βΊ Onshore wind
ONSHORE WIND Β· SHETHigh Brenfield 2
High Brenfield 2 is a 20 MW onshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at Craig Murrail GSP, with capacity due from October 2034. The connection agreement is held by High Brenfield Wind Farm Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2034 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-004876
- Customer
- High Brenfield Wind Farm Limited
- Technology
- Wind Onshore
- Total capacity
- 20 MW
- Change in this agreement
- +20 MW
- Capacity effective from
- 31 October 2034
- Connection site
- Craig Murrail GSP
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Other projects at Craig Murrail GSP
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem