Grid infrastructure βΊ Connection queue βΊ Battery storage
BATTERY STORAGE Β· SHETBattery Point BESS
Battery Point BESS is a 25 MW battery storage project in planning, connecting to the SSEN Transmission (north Scotland) network at Stornoway GSP, with capacity due from October 2030. The connection agreement is held by Point and Sandwick Power Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2030 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002335
- Customer
- Point and Sandwick Power Limited
- Technology
- Energy Storage System
- Total capacity
- 25 MW
- Change in this agreement
- +25 MW
- Capacity effective from
- 31 October 2030
- Connection site
- Stornoway GSP
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Scoping
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Stornoway GSP
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem