Grid infrastructure › Connection queue › Onshore wind

ONSHORE WIND · SHET

Loch Luichart Extension II

Loch Luichart Extension II is a 36 MW onshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at Loch Luichart Extension II Substation, with capacity due from October 2024. The connection agreement is held by Bluebell Wind Farm Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2024 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-000487
Customer
Bluebell Wind Farm Limited
Technology
Wind Onshore
Total capacity
36 MW
Change in this agreement
+36 MW
Capacity effective from
31 October 2024
Connection site
Loch Luichart Extension II Substation
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The connection site could not be placed on the map.

Projects connecting near Loch Luichart Extension II Substation · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem