Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · SHETScatsta Greener Grid Park
Scatsta Greener Grid Park is a 50 MW battery storage project in planning, connecting to the SSEN Transmission (north Scotland) network at Scatsta 132kV Substation, with capacity due from October 2028. The connection agreement is held by Statkraft Hydrogen UK Holding Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2028 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001955
- Customer
- Statkraft Hydrogen UK Holding Limited
- Technology
- Demand, Energy Storage System
- Total capacity
- 50 MW
- Change in this agreement
- +50 MW
- Capacity effective from
- 31 October 2028
- Connection site
- Scatsta 132kV Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.
Other projects at Scatsta 132kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem