Projects shown11122.7 GW in total
In planning91scoping or awaiting consent
Consented or building16closest to connecting
Built4connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

111 projects · page 2 of 3
ProjectCapacityStageConnection siteFrom
Zenobe Blackhillock 300 MW
Battery storage · Zenobe Blackhillock Limited
200 MWBuilt Blackhillock 275kV Substation
SSEN Transmission (north Scotland)
Zenobe New Deer Battery Storage
Battery storage · Zenobe Energy Limited
200 MWScoping New Deer 400kV Substation
SSEN Transmission (north Scotland)
Oct 2029
Upper Greenfields BESS
Battery storage · S4 UK DEV LTD
175 MWScoping New Deer 2 132kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Gresham House Connagill BESS
Battery storage · Energyhubdevelopments Limited
170 MWScoping New Connagill 275/132kV Substation
SSEN Transmission (north Scotland)
Oct 2031
Scotsburn Road
Battery storage · Tbc 002 Limited
170 MWScoping Fyrish 275kV Substation
SSEN Transmission (north Scotland)
Oct 2030
Balrobert Farm BESS
Battery storage · Elgin Energy Es Co Limited
150 MWScoping Knocknagael 132kV Substation
SSEN Transmission (north Scotland)
Oct 2032
Highland BESS
Battery storage · Apatura Battery Ltd
120 MWScoping Highland BESS 132kV Substation
SSEN Transmission (north Scotland)
May 2030
Beauly 02 BESS
Battery storage · Field Beauly Ltd
100 MWScoping BEAULY 02 BESS 132kV SUBSTATION
SSEN Transmission (north Scotland)
Dec 2028
Farm 100MW BESS
Battery storage · Apatura Battery Ltd
100 MWScoping Thurso South 275kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Sheilhill Battery Storage
Battery storage · Sheilhill Battery Storage Limited
100 MWAwaiting Consents St Fergus 132Kv Switching Station
SSEN Transmission (north Scotland)
Oct 2033
Thurso South BESS
Battery storage · WP Grid Storage 3 Limited
100 MWScoping Thurso South 275kV Substation
SSEN Transmission (north Scotland)
Oct 2030
17 Acres and BESS
Battery storage · Aeuk Battery Project II Ltd
96 MWScoping 17 Acres BESS 275Kv Substation
SSEN Transmission (north Scotland)
Jun 2032
Braegrundie Farm
Battery storage · Aeuk Battery Project III Ltd
95 MWAwaiting Consents Braegrundie Farm 132kV Substation
SSEN Transmission (north Scotland)
Jun 2030
Ladyfield Renewable Energy Park
Battery storage · Ladyfield Renewable Energy Park Ltd
68 MWScoping Creag Dhubh 275/132/33kV
SSEN Transmission (north Scotland)
Oct 2029
50MW BESS Connagill
Battery storage · Cerulisia Ltd
50 MWScoping New Connagill 275/132kV Substation
SSEN Transmission (north Scotland)
Oct 2031
Aultcraggie BESS
Battery storage · Opde UK Limited
50 MWScoping Brora GSP
SSEN Transmission (north Scotland)
Oct 2034
Jamesfield 3
Battery storage · Harmony Energy Limited
50 MWScoping New Abernethy 132kV
SSEN Transmission (north Scotland)
Oct 2037
Learney BESS
Battery storage · Igp Solar 22 Limited
50 MWScoping Learney BESS 132Kv
SSEN Transmission (north Scotland)
Oct 2032
Nether Pitforthie BESS
Battery storage · Opdenergy UK 14 Limited
50 MWScoping Fiddes 275/33Kv Grid Supply Point Substation
SSEN Transmission (north Scotland)
Oct 2032
Newton of Park BESS 2
Battery storage · Opdenergy UK 16 Limited
50 MWScoping Nairn 132/33kV Grid Supply Point Substation
SSEN Transmission (north Scotland)
Jan 2028
Persley Croft BESS
Battery storage · Persley Croft BESS Ltd
50 MWUnder Construction/Commissioning Persley 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Jul 2026
Rothienorman 50MW BESS
Battery storage · Rothienorman Flexpower Ltd
50 MWConsents Approved Rothienorman 400/33kV Substation
SSEN Transmission (north Scotland)
Jul 2027
Yamal BESS
Battery storage · Opde UK Limited
50 MWScoping MacDuff 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2033
Achanalt Battery Storage
Battery storage · Adtek Limited
50 MWScoping Grudie Bridge GSP
SSEN Transmission (north Scotland)
Oct 2027
Carseview Road BESS
Battery storage · Vital Energi Solutions Limited
50 MWScoping Lunanhead 2 GSP
SSEN Transmission (north Scotland)
Oct 2032
Corshellach Battery Energy Storage System
Battery storage · Corshellach Energy Storage Limited
50 MWConsents Approved Berryburn 275/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2028
Drum Farm Energy Storage Facility
Battery storage · Field Drum Farm Ltd
50 MWConsents Approved Keith 2 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2026
Drumlithie Battery Storage
Battery storage · Drumlithie Battery Limited
50 MWScoping Fetteresso GSP
SSEN Transmission (north Scotland)
Oct 2028
Drumore Farm
Battery storage · Drumore Battery Storage Limited
50 MWScoping Alness 2 275/33 kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2030
Dunmill Energy Storage
Battery storage · Dunmill Energy Storage Limited
50 MWScoping Bridge of Dun GSP
SSEN Transmission (north Scotland)
Jun 2032
Lovat Estate BESS
Battery storage · LG-B-50a Limited
50 MWConsents Approved Beauly 132/33 kV GSP Substation
SSEN Transmission (north Scotland)
May 2026
Meetlaw BESS
Battery storage · Carravindoon Limited
50 MWConsents Approved Fiddes GSP
SSEN Transmission (north Scotland)
Oct 2031
Navas BESS
Battery storage · Opde UK Limited
50 MWScoping Lairg GSP
SSEN Transmission (north Scotland)
Oct 2033
Overhill BESS
Battery storage · Pulse Clean Energy Spv Watt Limited
50 MWConsents Approved Rothienorman 2 400/33kV GSP
SSEN Transmission (north Scotland)
Oct 2024
Pitkerro Road
Battery storage · Vital Energi Solutions Limited
50 MWScoping Milton of Craigie GSP
SSEN Transmission (north Scotland)
Oct 2033
Scatsta Greener Grid Park
Battery storage · Statkraft Hydrogen UK Holding Limited
50 MWScoping Scatsta 132kV Substation
SSEN Transmission (north Scotland)
Oct 2028
Spittal
Battery storage · Spittal Battery Storage Limited
50 MWScoping Mybster 2 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2030
Taigh an Uillt Energy Storage Park
Battery storage · Springbank Energy Storage Park Limited
50 MWScoping Ichrachan 132/33Kv Grid Supply Point Substation
SSEN Transmission (north Scotland)
Oct 2035
Templeton BESS
Battery storage · Templeton Battery Storage Limited
50 MWScoping Lyndhurst 132/33kV
SSEN Transmission (north Scotland)
Oct 2031
Lyndhurst Camperdown BESS
Battery storage · Geocore Ltd
50 MWScoping Charleston GSP 132/33kV
SSEN Transmission (north Scotland)
Oct 2031
Baillie Greener Grid Park
Battery storage · Statkraft UK Ltd
48 MWScoping Baillie 275KV Substation
SSEN Transmission (north Scotland)
Sep 2030
Keith 132 Greener Grid Park
Battery storage · Keith Storage Solutions Limited
48 MWUnder Construction/Commissioning Keith 132kV Substation
SSEN Transmission (north Scotland)
Apr 2029
Lisa's Battery Storage
Battery storage · Potencia Energy Limited
47 MWAwaiting Consents Mybster 3 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2030
Contullich BESS
Battery storage · Contullich Energy Storage Limited
45 MWScoping Alness 2 275/33 kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2030
Boreland BESS
Battery storage · Boreland Energy Ltd
43 MWScoping Killin GSP
SSEN Transmission (north Scotland)
Oct 2031
Coupar Angus Battery
Battery storage · Coupar Limited
40 MWConsents Approved Coupar Angus 132/33kV GSP
SSEN Transmission (north Scotland)
Feb 2022
Keith Battery Storage
Battery storage · Field Keith Ltd
39 MWConsents Approved Keith 1 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2026
Arbroath Battery Substation
Battery storage · Arbroath Limited
35 MWConsents Approved Arbroath GSP
SSEN Transmission (north Scotland)
Feb 2022
Elgin BESS
Battery storage · GPC 612 Ltd
30 MWScoping Elgin GSP
SSEN Transmission (north Scotland)
Oct 2028
Fiddes Battery Storage
Battery storage · Fiddes Battery Limited
30 MWScoping Fiddes GSP
SSEN Transmission (north Scotland)
Oct 2028

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.