Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · SHETSheilhill Battery Storage
Sheilhill Battery Storage is a 100 MW battery storage project in planning, connecting to the SSEN Transmission (north Scotland) network at St Fergus 132Kv Switching Station, with capacity due from October 2033. The connection agreement is held by Sheilhill Battery Storage Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2033 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002149
- Customer
- Sheilhill Battery Storage Limited
- Technology
- Energy Storage System
- Total capacity
- 100 MW
- Change in this agreement
- +100 MW
- Capacity effective from
- 31 October 2033
- Connection site
- St Fergus 132Kv Switching Station
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Awaiting Consents
- Connections reform gate
- Gate 1
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem