Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SHET

17 Acres and BESS

17 Acres and BESS is a 96 MW battery storage project in planning, connecting to the SSEN Transmission (north Scotland) network at 17 Acres BESS 275Kv Substation, with capacity due from June 2032. The connection agreement is held by Aeuk Battery Project II Ltd.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Jun 2032 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-004392
Customer
Aeuk Battery Project II Ltd
Technology
Energy Storage System
Total capacity
96 MW
Change in this agreement
+96 MW
Capacity effective from
30 June 2032
Connection site
17 Acres BESS 275Kv Substation
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.

Projects connecting near · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem