United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in ERCOT (Texas) — page 40
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Chocolate Bayou BESS Battery storage · Concurrent Holdco. , LLC. |
9.9 MW | In study |
| Apple BESS Battery storage · Apple Infra LLC |
9.9 MW | Agreement signed |
| Leakey BESS Battery storage · Regis Leaky LLC |
9.9 MW | In study |
| Highway 6 BESS Battery storage · Hwy 6 Infra LLC |
9.9 MW | Agreement signed |
| Palmview BESS Battery storage · SBESS TX14 LLC |
9.9 MW | Agreement signed |
| Buda BESS Battery storage · Buda Infra LLC |
9.9 MW | Agreement signed |
| Hidden Valley BESS Battery storage · Regis Hidden Valley, LLC |
9.9 MW | Agreement signed |
| Lyssy BESS Battery storage · Regis Lyssy LLC |
9.9 MW | Agreement signed |
| Mesquite BESS Battery storage · Grenergy USA |
9.9 MW | Agreement signed |
| Cedarvale Gas Gas · RPC Merchant LLC |
9.9 MW | Agreement signed |
| Milton BESS Battery storage · Regis Milton LLC |
9.9 MW | Agreement signed |
| Torrecillas BESS Battery storage · Torrecillas Interconnect, LLC |
9.9 MW | Agreement signed |
| Cotulla BESS 1 Battery storage · SBESS TX19 LLC |
9.9 MW | Agreement signed |
| Utopia BESS Battery storage · Regis Utopia, LLC |
9.8 MW | Agreement signed |
| Medina Lake BESS Battery storage · Regis Medina Lake LLC |
9.8 MW | Agreement signed |
| Indian Mesa repower Onshore wind · Nextera |
9.3 MW | Agreement signed |
| Panther Creek 2 Repower Onshore wind · Panther Creek Wind Farm I&II, LLC |
8.0 MW | In study |
| Hovey Solar 2 Solar · BARILLA SOLAR, LLC |
7.5 MW | In study |
| Sweetwater 2 repower Onshore wind · Leeward Energy |
7.3 MW | Agreement signed |
| Desert Sky repower Onshore wind · DESERT SKY WIND FARM LLC |
7.2 MW | Agreement signed |
| Trent repower Onshore wind · TRENT WIND FARM LLC |
6.4 MW | Agreement signed |
| Roadrunner Crossing Wind (Uprate) Wind + storage · Roadrunner Wind, LLC |
3.3 MW | In study |
| Rio Nogales CT1 Rotor Replacement Gas · CPS Energy |
3.1 MW | Agreement signed |
| CPS Rio Nogales CT301 Rotor Replacement Gas · CPS Energy |
3.1 MW | Agreement signed |
| CPS Rio Nogales CT201 Rotor Replacement Gas · CPS Energy |
3.1 MW | Agreement signed |
| Sweetwater 1 repower Onshore wind · Leeward Energy |
3.0 MW | Agreement signed |
| Ashra Storage SLF Solar + storage · Ashra Solar, LLC |
1.6 MW | In study |
| Kickstart Energy Storage IV Battery storage · Kickstart Infrastructure LLC |
1.4 MW | In study |
| Kickstart Energy Storage III Battery storage · Kickstart Infrastructure LLC |
1.4 MW | In study |
| Kickstart Energy Storage I Battery storage · Kickstart Infrastructure LLC |
1.4 MW | In study |
| Kickstart Energy Storage II Battery storage · Kickstart Infrastructure LLC |
1.4 MW | In study |
| Champion Wind Repower Onshore wind · Champion Wind Farm, LLC |
0.3 MW | Agreement signed |
| Silver Star repower Onshore wind · Silver Star I Power Partners, LLC |
-7.2 MW | Agreement signed |
| Sherbino II Wind repower Onshore wind · Sherbino II Wind Farm LLC |
-18.0 MW | Agreement signed |
| Trinity Hills Wind repower Onshore wind · Trinity Hills Wind Farm LLC |
-27.0 MW | Agreement signed |
| Giga Austin Solar Solar · GIGA TEXAS ENERGY LLC |
-53.3 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,857 · 519.1 GW
- ERCOT (Texas)1,986 · 447.3 GW
- MISO (Midcontinent)1,646 · 350.1 GW
- CAISO (California)429 · 188.6 GW
- Southeast (non-ISO utilities)1,067 · 161.4 GW
- SPP (Southwest Power Pool)692 · 152.4 GW
- PJM (Mid-Atlantic, Midwest)1,248 · 140.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)72 · 14.6 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)