United States βΊ Grid βΊ Interconnection queues
SOLAR Β· ERCOTHovey Solar 2
Hovey Solar 2 is a 7.5 MW solar request in interconnection study in the ERCOT interconnection queue.
Queue statusIn planning
- PlanningQueued Nov 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jul 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 26INR0736
- Grid region
- ERCOT (Texas)
- Developer
- BARILLA SOLAR, LLC
- Connection point (POI)
- 60385 Solstice 138 kV
- Technology
- Solar: 7.5 MW
- Total requested
- 7.5 MW
- Study phase
- No MRD
- Queue status
- Active
- Entered queue
- 28 November 2025
- Proposed online date
- July 2026
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem