BATTERY STORAGE Β· ERCOTChocolate Bayou BESS
Chocolate Bayou BESS is a 9.9 MW battery storage request in interconnection study in the ERCOT interconnection queue.
Queue statusIn planning
- PlanningQueued Aug 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget May 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 24INR0583
- Grid region
- ERCOT (Texas)
- Developer
- Concurrent Holdco. , LLC.
- Connection point (POI)
- Station Name: CHOCBAYU _x000D_ Load Name: 38_12_1. Node number 0701._x000D_ Bus #: 80064_x000D_ Voltage: 138 kV
- Technology
- Battery: 9.9 MW
- Total requested
- 9.9 MW
- Study phase
- No MRD
- Queue status
- Active
- Entered queue
- 22 August 2023
- Proposed online date
- May 2026
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem