BATTERY STORAGE ยท ERCOTLeakey BESS
Leakey BESS is a 9.9 MW battery storage request in interconnection study in the ERCOT interconnection queue.
Queue statusIn planning
- PlanningQueued Nov 2022 (current stage)
- ConsentedJan 2023 (not yet reached)
- Construction (not yet reached)
- OperatingTarget May 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 23INR0548
- Grid region
- ERCOT (Texas)
- Developer
- Regis Leaky LLC
- Connection point (POI)
- Station Name (TDSP Station Code): LEAKEY; Load/Load Transformer Name: L_LEAKEY9_1Y; PTI BUS Name: 7426; Voltage in kV (Transmission Level): 69kV_x000D_ Transformers: 3x 4000kVA 800VAC ลรฎ - 24.9kVA ลโข
- Technology
- Battery: 9.9 MW
- Total requested
- 9.9 MW
- Study phase
- No MRD
- Queue status
- Active
- Entered queue
- 29 November 2022
- Agreement signed
- 18 January 2023
- Proposed online date
- May 2026
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem