BATTERY STORAGE ยท ERCOT

Leakey BESS

Leakey BESS is a 9.9 MW battery storage request in interconnection study in the ERCOT interconnection queue.

Queue statusIn planning
  1. PlanningQueued Nov 2022 (current stage)
  2. ConsentedJan 2023 (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget May 2026 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
23INR0548
Grid region
ERCOT (Texas)
Developer
Regis Leaky LLC
Connection point (POI)
Station Name (TDSP Station Code): LEAKEY; Load/Load Transformer Name: L_LEAKEY9_1Y; PTI BUS Name: 7426; Voltage in kV (Transmission Level): 69kV_x000D_ Transformers: 3x 4000kVA 800VAC ล’รฎ - 24.9kVA ล’โ€ข
Technology
Battery: 9.9 MW
Total requested
9.9 MW
Study phase
No MRD
Queue status
Active
Entered queue
29 November 2022
Agreement signed
18 January 2023
Proposed online date
May 2026

Location

No county location in the queue data.

Power plants in ยท Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem